Bored Panda works better on our iPhone app
Continue in app Continue in browser

The Bored Panda iOS app is live! Fight boredom with iPhones and iPads here.

Guy Plans A Bar Crawl For A Sober Woman Who Told Him She Doesn’t Drink, She Sees Red Flags And Runs
Couple shares coffee on a cozy date, highlighting recovery challenges and avoiding bars during their outing.

Recovering Alcoholic Upset Learning Date's Idea Of Hanging Out At Bars, Decides To Cancel On Him

27

ADVERTISEMENT

Unless you’re lucky enough to have an actual meet cute (we can dream, ok?), dating is probably your best bet. But it can be daunting, especially in the world of dating apps, where ghosting after the first date is basically par for the course. 

A woman, who swiped right and matched, agreed to a coffee date that turned into plans for a second one. When the guy insisted on arranging everything, she was charmed, until he told her where he’d made dinner reservations. Then things went sideways.    

 More info: Reddit

RELATED:

    Dating in this day and age can be challenging to say the least, so if you both swiped right, met up, and have agreed to a second date, it’s usually a good sign

    Couple on a second date at a coffee shop, highlighting recovering alcoholic avoiding bars during their outing.

    Image credits: svetlanasokolova / Freepik (not the actual photo)

    One woman, who met a guy on a dating app, was hopeful after they went out for a coffee and ended up making loose plans for dinner the next week

    Text excerpt showing a recovering alcoholic canceling a second date that was planned entirely around bars.

    ADVERTISEMENT

    Text highlighting a recovering alcoholic realizing their second date was planned around bars and choosing to opt out.

    Recovering alcoholic shares experience noping out of second date planned entirely around bars due to sobriety concerns.

    Recovering alcoholic woman on a second date, sitting on a couch with a man, looking surprised and hesitant.

    ADVERTISEMENT

    Image credits: lookstudio / Freepik (not the actual photo)

    ADVERTISEMENT

    The guy insisted on planning the night and asked her if she had any dietary restrictions, so she told him she doesn’t eat red meat or drink alcohol

    Text discussing a recovering alcoholic with two years sober explaining dietary restrictions and substance use comfort on a date.

    Text explaining a recovering alcoholic setting boundaries about alcohol and dietary preferences on a date, avoiding bars.

    ADVERTISEMENT

    Text excerpt about a recovering alcoholic surprised by a date planned entirely around bars and a cocktail lounge reservation.

    Text excerpt describing limited menu options at a cocktail lounge affecting a recovering alcoholic’s second date experience.

    ADVERTISEMENT

    Text describing a recovering alcoholic confused by a second date planned entirely around bars despite their sobriety.

    ADVERTISEMENT

    Man holding smartphone near window, appearing surprised while talking inside a modern cafe or bar setting.

    Image credits: Wavebreak Media / Freepik (not the actual photo)

    The night before the date, he texted that he’d made reservations at a spot she hadn’t heard of, but when she looked it up, it was a cocktail bar with a very meat-based menu

    Text excerpt discussing discomfort of recovering alcoholic with a second date planned entirely around bars.

    Text discussing a recovering alcoholic deciding not to continue a date planned around bars, prioritizing personal boundaries.

    ADVERTISEMENT
    ADVERTISEMENT

    Text explaining dining options in a major city, highlighting hundreds of incredible food choices available.

    Text about recovering alcoholic feeling uncomfortable on second date planned entirely around bars with limited food options.

    Text excerpt describing a recovering alcoholic backing out of a second date after realizing it was planned around bars.

    ADVERTISEMENT

    Text excerpt from recovering alcoholic doubting choices on second date planned around bars seeking objective opinions.

    ADVERTISEMENT

    Text post asking Reddit if a planned date centered around bars is a red flag or an overreaction from a recovering alcoholic.

    Text excerpt showing a recovering alcoholic explaining their priorities of friendship, hobbies, and owning a home over rushed dating.

    Image credits:

    ADVERTISEMENT

    After his next suggestion was ending the night at yet another bar, she told him she thought they weren’t a good match, but now she’s wondering if she overreacted

    The original poster (OP) is second-guessing herself after canceling a second date with a guy, fearing it felt like a future tolerance test. They met on a dating app, had a coffee that went well enough, and loosely planned a dinner date for the following week.

    When he insisted on planning everything and asked her if there was any dietary stuff he should know about, she explained her only two boundaries – no red meat due to health reasons, and no alcohol because she’s nearly two years sober. She added that she wasn’t picky, loved most foods, and was comfy around alcohol; she just didn’t drink it.

    The night before the date, though, he revealed the reservation was at a cocktail lounge with limited food options, most of them meat-heavy. Things got weirder when he suggested barhopping for a nightcap afterward. For someone aware that she’s sober, his choice of two bars, and only one edible option on the menu, left her stumped.

    Trusting her gut, she bailed on the date, worried this was some kind of early test of how much she’d compromise herself moving ahead. His blunt reply, complete with peace-sign-hand emoji, only made things stranger. Now she’s turned to netizens, wondering if she overreacted or actually dodged a bullet wrapped in red flags. 

    ADVERTISEMENT

    Young woman recovering alcoholic looks concerned checking her phone while sitting on a couch in a bright living room

    ADVERTISEMENT

    Image credits: prostock-studio / Freepik (not the actual photo)

    Dating these days is like playing blackjack. Blindfolded. You’re mostly gambling to strike it lucky with the right swipe right and play your cards into a successful first date. Let’s say you do (you charmer, you!), should you double down and go all in for a second one? And when shouldn’t you?  

    Well, the experts at VeryWellMind say that, in a perfect world, we’d go on first dates and know straight away if we were excited about going on a second one or if we should give that idea a pass. But often we’re left feeling indecisive. Parts of the date may have been great, while others, well, not quite what we expected. Outdated profile pic, anyone? 

    “Even if you don’t feel a crazy spark when you first meet the person, if you enjoyed the conversation and company, it’s probably worth giving them a second date,” says Dr. Sabrina Romanoff, licensed psychologist. Seems simple enough. But if you’re still having doubts, read on.

    ADVERTISEMENT

    The pros over at Bustle say there are a few signs you shouldn’t give your date a second round. A few of the best include you not being that attracted to them, if you had an argument, or if they tried to push your boundaries. That last one sure sounds familiar, doesn’t it?

    Luckily, OP went with her red meat-free, sober gut and got out of there. Here’s hoping her dating days aren’t over just because of one jerk with empathy issues. What’s your take? Did OP overreact, or do you think the guy was just lowkey trying to torpedo any chance of a second date? Drop your thoughts in the comments!   

    In the comments, readers agreed that the woman was not a jerk and that the whole situation was a mess of red flags

    Reddit user shares experience as recovering alcoholic avoiding second date planned entirely around bars.

    ADVERTISEMENT
    ADVERTISEMENT

    Comments discussing concerns about sobriety and feedback from a recovering alcoholic about a second date planned around bars.

    Screenshot of an online discussion about a recovering alcoholic avoiding a second date planned around bars.

    Online conversation about a recovering alcoholic declining a second date focused entirely on bars and drink options.

    ADVERTISEMENT

    Screenshot of a Reddit comment discussing a recovering alcoholic rejecting a second date planned entirely around bars.

    ADVERTISEMENT

    Comment advising a recovering alcoholic to confidently block a guy who planned a bar-centered second date.

    Comment on Reddit discussing recovering alcoholic declining a second date planned entirely around bars.

    Screenshot of a forum comment discussing a recovering alcoholic refusing a second date planned around bars.

    ADVERTISEMENT

    Comment about recovering alcoholic noping out of a second date planned entirely around bars due to drinking concerns.

    ADVERTISEMENT

    Comment expressing support for a recovering alcoholic who backed out of a second date planned around bars.

    Text post from a forum discussing a recovering alcoholic setting boundaries on a second date planned around bars.

    ADVERTISEMENT

    Comment discussing a recovering alcoholic setting boundaries and rejecting a second date planned entirely around bars.

    Screenshot of an online comment discussing a recovering alcoholic noping out of a second date planned entirely around bars.

    ADVERTISEMENT
    ADVERTISEMENT
    Share on Facebook
    Ivan Ayliffe

    Ivan Ayliffe

    Writer, BoredPanda staff

    Read more »

    After twenty years in advertising, I've decided to try my hand at journalism. I'm lucky enough to be based in Cape Town, South Africa and use every opportunity I get to explore everything it has to offer, both indoors and out. When I'm not reading, writing, or listening to podcasts, I spend my time swimming in the ocean, running mountain trails, and skydiving. While I haven't travelled as much as I'd like, I did live in !ndia, which was an incredible experience. Oh, and I love live music. I hope you enjoy my stories!

    Read less »
    Ivan Ayliffe

    Ivan Ayliffe

    Writer, BoredPanda staff

    After twenty years in advertising, I've decided to try my hand at journalism. I'm lucky enough to be based in Cape Town, South Africa and use every opportunity I get to explore everything it has to offer, both indoors and out. When I'm not reading, writing, or listening to podcasts, I spend my time swimming in the ocean, running mountain trails, and skydiving. While I haven't travelled as much as I'd like, I did live in !ndia, which was an incredible experience. Oh, and I love live music. I hope you enjoy my stories!

    Monika Pašukonytė

    Monika Pašukonytė

    Author, BoredPanda staff

    Read more »

    I am a visual editor here. In my free time I enjoy the vibrant worlds of art galleries, exhibitions, and soulful concerts. Yet, amidst life's hustle and bustle, I find solace in nature's embrace, cherishing tranquil moments with beloved friends. Deep within, I hold a dream close - to embark on a global journey in an RV, accompanied by my faithful canine companion. Together, we'll wander through diverse cultures, weaving precious memories under the starry night sky, fulfilling the wanderlust that stirs my soul.

    Read less »

    Monika Pašukonytė

    Monika Pašukonytė

    Author, BoredPanda staff

    I am a visual editor here. In my free time I enjoy the vibrant worlds of art galleries, exhibitions, and soulful concerts. Yet, amidst life's hustle and bustle, I find solace in nature's embrace, cherishing tranquil moments with beloved friends. Deep within, I hold a dream close - to embark on a global journey in an RV, accompanied by my faithful canine companion. Together, we'll wander through diverse cultures, weaving precious memories under the starry night sky, fulfilling the wanderlust that stirs my soul.

    What do you think ?
    FreeTheUnicorn
    Community Member
    1 day ago Created by potrace 1.15, written by Peter Selinger 2001-2017

    This is what dating is for - to find out if you want to spend more time with this person. There's no obligation to have another date if you're not enthused about it . As long as you're kind about declining, you can't be the AH for not wanting another date

    ॐBoyGanesh
    Community Member
    1 day ago

    This comment is hidden. Click here to view.

    I’ve worked in food & beverage and bartended for years, but I’m not much of a drinker or really into alcohol-driven social scenes. I’ll hav a nice wine paring with dinner, the occasional celebratory drinks & such, but for the most part it’s just not something I consider. I know many folks in recovery & there seem to be two basic rules I follow with them: don’t organize events at bars or around alcohol and minimize their exposure to it in all other cases. (Wine country isn’t an ideal weekend get-away.) It’s not difficult. In fact, it really takes no effort at all. To plan a 2nd date centered on booze and/or at a bar is a cowards way to express they’re no longer interested in dating.

    Sally Moen
    Community Member
    1 day ago Created by potrace 1.15, written by Peter Selinger 2001-2017

    Just like any person in any kind of recovery, there are folks that get a special thrill out of dragging you back into your a*******n. Usually they themselves atleast overindulge if not need recovery themselves, and seeing others go backwards justified their own messed up habits. The thing is, there's a vast market of folks who do not do this, aren't interested in dragging you backwards, and at worst are very neutral about what you drink or smoke or whatever, they have other things on their mind

    Apatheist
    Community Member
    1 day ago Created by potrace 1.15, written by Peter Selinger 2001-2017

    I wonder if he's looking for a designated driver, so that he can do all the drinking? Talking about going for a nightcap is definitely a red flag (unless he meant cocoa, which I doubt).

    Kate Johnson
    Community Member
    Premium
    1 day ago Created by potrace 1.15, written by Peter Selinger 2001-2017

    Always listen to your instincts. OP was right to tap out.

    HamsterGirl
    Community Member
    3 hours ago Created by potrace 1.15, written by Peter Selinger 2001-2017

    100% NTA. He is a walking red flag. That date was a disaster waiting to happen! Bullet dodged 100%. Well done on your sobriety!

    FreeTheUnicorn
    Community Member
    1 day ago Created by potrace 1.15, written by Peter Selinger 2001-2017

    This is what dating is for - to find out if you want to spend more time with this person. There's no obligation to have another date if you're not enthused about it . As long as you're kind about declining, you can't be the AH for not wanting another date

    ॐBoyGanesh
    Community Member
    1 day ago

    This comment is hidden. Click here to view.

    I’ve worked in food & beverage and bartended for years, but I’m not much of a drinker or really into alcohol-driven social scenes. I’ll hav a nice wine paring with dinner, the occasional celebratory drinks & such, but for the most part it’s just not something I consider. I know many folks in recovery & there seem to be two basic rules I follow with them: don’t organize events at bars or around alcohol and minimize their exposure to it in all other cases. (Wine country isn’t an ideal weekend get-away.) It’s not difficult. In fact, it really takes no effort at all. To plan a 2nd date centered on booze and/or at a bar is a cowards way to express they’re no longer interested in dating.

    Sally Moen
    Community Member
    1 day ago Created by potrace 1.15, written by Peter Selinger 2001-2017

    Just like any person in any kind of recovery, there are folks that get a special thrill out of dragging you back into your a*******n. Usually they themselves atleast overindulge if not need recovery themselves, and seeing others go backwards justified their own messed up habits. The thing is, there's a vast market of folks who do not do this, aren't interested in dragging you backwards, and at worst are very neutral about what you drink or smoke or whatever, they have other things on their mind

    Apatheist
    Community Member
    1 day ago Created by potrace 1.15, written by Peter Selinger 2001-2017

    I wonder if he's looking for a designated driver, so that he can do all the drinking? Talking about going for a nightcap is definitely a red flag (unless he meant cocoa, which I doubt).

    Kate Johnson
    Community Member
    Premium
    1 day ago Created by potrace 1.15, written by Peter Selinger 2001-2017

    Always listen to your instincts. OP was right to tap out.

    HamsterGirl
    Community Member
    3 hours ago Created by potrace 1.15, written by Peter Selinger 2001-2017

    100% NTA. He is a walking red flag. That date was a disaster waiting to happen! Bullet dodged 100%. Well done on your sobriety!

    You May Like
    Related on Bored Panda
    Popular on Bored Panda
    Trending on Bored Panda
    Also on Bored Panda
    ADVERTISEMENT