Bored Panda works better on our iPhone app
Continue in app Continue in browser

The Bored Panda iOS app is live! Fight boredom with iPhones and iPads here.

Woman Feels Date Was “Testing” How Far She’d Go By Violating Her Food Preferences, Cancels Date
Couple shares coffee on a cozy date, highlighting recovery challenges and avoiding bars during their outing.
5

Woman Feels Date Was “Testing” How Far She’d Go By Violating Her Food Preferences, Cancels Date

37

ADVERTISEMENT

Unless you’re lucky enough to have an actual meet cute (we can dream, ok?), dating is probably your best bet. But it can be daunting, especially in the world of dating apps, where ghosting after the first date is basically par for the course. 

A woman, who swiped right and matched, agreed to a coffee date that turned into plans for a second one. When the guy insisted on arranging everything, she was charmed, until he told her where he’d made dinner reservations. Then things went sideways.    

 More info: Reddit

RELATED:

    Dating in this day and age can be challenging to say the least, so if you both swiped right, met up, and have agreed to a second date, it’s usually a good sign

    Image credits: svetlanasokolova / Freepik (not the actual photo)

    One woman, who met a guy on a dating app, was hopeful after they went out for a coffee and ended up making loose plans for dinner the next week

    ADVERTISEMENT

    Image credits: lookstudio / Freepik (not the actual photo)

    ADVERTISEMENT

    The guy insisted on planning the night and asked her if she had any dietary restrictions, so she told him she doesn’t eat red meat or drink alcohol

    ADVERTISEMENT
    ADVERTISEMENT
    ADVERTISEMENT

    Image credits: Wavebreak Media / Freepik (not the actual photo)

    The night before the date, he texted that he’d made reservations at a spot she hadn’t heard of, but when she looked it up, it was a cocktail bar with a very meat-based menu

    ADVERTISEMENT
    ADVERTISEMENT
    ADVERTISEMENT
    ADVERTISEMENT

    Image credits:

    After his next suggestion was ending the night at yet another bar, she told him she thought they weren’t a good match, but now she’s wondering if she overreacted

    The original poster (OP) is second-guessing herself after canceling a second date with a guy, fearing it felt like a future tolerance test. They met on a dating app, had a coffee that went well enough, and loosely planned a dinner date for the following week.

    When he insisted on planning everything and asked her if there was any dietary stuff he should know about, she explained her only two boundaries – no red meat due to health reasons, and no alcohol because she’s nearly two years sober. She added that she wasn’t picky, loved most foods, and was comfy around alcohol; she just didn’t drink it.

    The night before the date, though, he revealed the reservation was at a cocktail lounge with limited food options, most of them meat-heavy. Things got weirder when he suggested barhopping for a nightcap afterward. For someone aware that she’s sober, his choice of two bars, and only one edible option on the menu, left her stumped.

    ADVERTISEMENT

    Trusting her gut, she bailed on the date, worried this was some kind of early test of how much she’d compromise herself moving ahead. His blunt reply, complete with peace-sign-hand emoji, only made things stranger. Now she’s turned to netizens, wondering if she overreacted or actually dodged a bullet wrapped in red flags. 

    Image credits: prostock-studio / Freepik (not the actual photo)

    ADVERTISEMENT

    Dating these days is like playing blackjack. Blindfolded. You’re mostly gambling to strike it lucky with the right swipe right and play your cards into a successful first date. Let’s say you do (you charmer, you!), should you double down and go all in for a second one? And when shouldn’t you?  

    Well, the experts at VeryWellMind say that, in a perfect world, we’d go on first dates and know straight away if we were excited about going on a second one or if we should give that idea a pass. But often we’re left feeling indecisive. Parts of the date may have been great, while others, well, not quite what we expected. Outdated profile pic, anyone? 

    ADVERTISEMENT

    “Even if you don’t feel a crazy spark when you first meet the person, if you enjoyed the conversation and company, it’s probably worth giving them a second date,” says Dr. Sabrina Romanoff, licensed psychologist. Seems simple enough. But if you’re still having doubts, read on.

    The pros over at Bustle say there are a few signs you shouldn’t give your date a second round. A few of the best include you not being that attracted to them, if you had an argument, or if they tried to push your boundaries. That last one sure sounds familiar, doesn’t it?

    Luckily, OP went with her red meat-free, sober gut and got out of there. Here’s hoping her dating days aren’t over just because of one jerk with empathy issues. What’s your take? Did OP overreact, or do you think the guy was just lowkey trying to torpedo any chance of a second date? Drop your thoughts in the comments!   

    In the comments, readers agreed that the woman was not a jerk and that the whole situation was a mess of red flags

    ADVERTISEMENT
    ADVERTISEMENT
    ADVERTISEMENT
    ADVERTISEMENT
    ADVERTISEMENT
    ADVERTISEMENT
    ADVERTISEMENT

    Poll Question

    Total votes ·

    Thanks! Check out the results:

    Total votes ·
    Share on Facebook
    Ivan Ayliffe

    Ivan Ayliffe

    Writer, Community member

    Read more »

    After twenty years in advertising, I've decided to try my hand at journalism. I'm lucky enough to be based in Cape Town, South Africa and use every opportunity I get to explore everything it has to offer, both indoors and out. When I'm not reading, writing, or listening to podcasts, I spend my time swimming in the ocean, running mountain trails, and skydiving. While I haven't travelled as much as I'd like, I did live in !ndia, which was an incredible experience. Oh, and I love live music. I hope you enjoy my stories!

    Read less »
    Ivan Ayliffe

    Ivan Ayliffe

    Writer, Community member

    After twenty years in advertising, I've decided to try my hand at journalism. I'm lucky enough to be based in Cape Town, South Africa and use every opportunity I get to explore everything it has to offer, both indoors and out. When I'm not reading, writing, or listening to podcasts, I spend my time swimming in the ocean, running mountain trails, and skydiving. While I haven't travelled as much as I'd like, I did live in !ndia, which was an incredible experience. Oh, and I love live music. I hope you enjoy my stories!

    What do you think ?
    FreeTheUnicorn
    Community Member
    7 months ago Created by potrace 1.15, written by Peter Selinger 2001-2017

    This is what dating is for - to find out if you want to spend more time with this person. There's no obligation to have another date if you're not enthused about it . As long as you're kind about declining, you can't be the AH for not wanting another date

    Apatheist
    Community Member
    7 months ago Created by potrace 1.15, written by Peter Selinger 2001-2017

    I wonder if he's looking for a designated driver, so that he can do all the drinking? Talking about going for a nightcap is definitely a red flag (unless he meant cocoa, which I doubt).

    ॐBoyGanesh
    Community Member
    7 months ago

    This comment is hidden. Click here to view.

    I’ve worked in food & beverage and bartended for years, but I’m not much of a drinker or really into alcohol-driven social scenes. I’ll hav a nice wine paring with dinner, the occasional celebratory drinks & such, but for the most part it’s just not something I consider. I know many folks in recovery & there seem to be two basic rules I follow with them: don’t organize events at bars or around alcohol and minimize their exposure to it in all other cases. (Wine country isn’t an ideal weekend get-away.) It’s not difficult. In fact, it really takes no effort at all. To plan a 2nd date centered on booze and/or at a bar is a cowards way to express they’re no longer interested in dating.

    Load More Comments
    FreeTheUnicorn
    Community Member
    7 months ago Created by potrace 1.15, written by Peter Selinger 2001-2017

    This is what dating is for - to find out if you want to spend more time with this person. There's no obligation to have another date if you're not enthused about it . As long as you're kind about declining, you can't be the AH for not wanting another date

    Apatheist
    Community Member
    7 months ago Created by potrace 1.15, written by Peter Selinger 2001-2017

    I wonder if he's looking for a designated driver, so that he can do all the drinking? Talking about going for a nightcap is definitely a red flag (unless he meant cocoa, which I doubt).

    ADVERTISEMENT
    ॐBoyGanesh
    Community Member
    7 months ago

    This comment is hidden. Click here to view.

    I’ve worked in food & beverage and bartended for years, but I’m not much of a drinker or really into alcohol-driven social scenes. I’ll hav a nice wine paring with dinner, the occasional celebratory drinks & such, but for the most part it’s just not something I consider. I know many folks in recovery & there seem to be two basic rules I follow with them: don’t organize events at bars or around alcohol and minimize their exposure to it in all other cases. (Wine country isn’t an ideal weekend get-away.) It’s not difficult. In fact, it really takes no effort at all. To plan a 2nd date centered on booze and/or at a bar is a cowards way to express they’re no longer interested in dating.

    Load More Comments
    Related on Bored Panda
    Popular on Bored Panda
    Trending on Bored Panda
    Also on Bored Panda
    ADVERTISEMENT